Amiga-Z Wiki

“Modern tools for old-school communities.”

User Tools

Site Tools


projects:move_along:operations:onboarding

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
projects:move_along:operations:onboarding [2026/02/19 16:58] – removed - external edit (Unknown date) 127.0.0.1projects:move_along:operations:onboarding [2026/02/19 16:58] (current) – ↷ Page moved from projects:move_along:onboarding to projects:move_along:operations:onboarding freedomotter
Line 1: Line 1:
 +====== Pilot Station Onboarding Checklist ======
 +
 +Purpose:
 +Standardize first customer installs.
 +
 +----
 +
 +===== Pre-Install =====
 +
 +  - Confirm station contact person
 +  - Confirm automation system (Rivendell version)
 +  - Collect advertiser list
 +  - Collect active campaigns
 +  - Gather existing traffic logs (if migrating)
 +  - Determine hosting (self-host or managed)
 +
 +----
 +
 +===== Installation =====
 +
 +  - Deploy server instance
 +  - Configure database
 +  - Create admin user
 +  - Set up station defaults
 +  - Configure log export format
 +  - Run test export
 +
 +----
 +
 +===== Data Setup =====
 +
 +  - Import advertisers
 +  - Import contracts
 +  - Create test campaign
 +  - Schedule sample day
 +  - Validate log output
 +
 +----
 +
 +===== Training =====
 +
 +  - 60-minute Zoom walkthrough
 +  - Show campaign creation
 +  - Show conflict resolution
 +  - Show log generation
 +  - Show corrections workflow
 +
 +----
 +
 +===== Post-Launch =====
 +
 +  - Check-in after 7 days
 +  - Collect feedback
 +  - Log feature requests
 +  - Request testimonial after 30 days
 +
 +----
 +
 +===== Early Adopter Goals =====
 +
 +  - 3–5 stable pilot stations
 +  - Collect case studies
 +  - Refine onboarding time to <4 hours per station
  

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki